Home | Projects | Docapesca renovates the floating breakwater at the Fishing Port of Esposende
Docapesca renovates the floating breakwater at the Fishing Port of Esposende
13-03-2024
Docapesca has completed the renovation of the breakwater at the Fishing Port of Esposende. Lindley was the company responsible for supplying and installing the pontoon, which provides excellent shelter conditions for fishing vessels. Over 160 linear meters of concrete pontoon make up this breakwater, with a width of 3 meters, whose mooring system consists of aluminum rings designed for existing piles.
In 2019, Lindley had already renovated the pontoons at the Fishing Port of Esposende for the contractor MCA, which was responsible for the renovation of the entire fishing port.