Home | Projects | Lindley installs floating pool at the new Odeleite river beach
Lindley installs floating pool at the new Odeleite river beach
21-08-2025
Lindley has completed the installation of a SAGRES floating pool at the Odeleite reservoir, in Castro Marim, as part of the new river beach project to be inaugurated in July.
The structure, measuring 20 meters long by 10 meters wide, was commissioned by Eduardo Pinto Viegas, Lda., the contractor responsible for the project. The pool features a Massaranduba hardwood deck, ensuring durability, comfort, and integration with the natural surroundings.
This floating pool provides a new leisure space for both residents and visitors, contributing to local tourism development and enhancing the Algarve’s inland region.

With this project, Lindley reinforces its expertise in delivering floating solutions for inland bathing areas, marinas, and ports, supporting local communities and promoting sustainable tourism.